0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Bridge over the motorway A27, steel truss with a FRP deck

 Bridge over the motorway A27, steel truss with a FRP deck
Autor(en): ,
Beitrag für IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015, veröffentlicht in , S. 1583-1590
DOI: 10.2749/222137815818358952
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.08 MB

In the Netherlands a bridge is built crossing the motorway A27 near Utrecht. This bridge was constructed as a combination of steel and FRP, with a total length of 140 meters. The bridge is made of ...
Weiterlesen

Bibliografische Angaben

Autor(en): (Movares, Utrecht, the Netherlands)
(Movares, Utrecht, the Netherlands)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015
Veröffentlicht in:
Seite(n): 1583-1590 Anzahl der Seiten (im PDF): 8
Seite(n): 1583-1590
Anzahl der Seiten (im PDF): 8
Jahr: 2015
DOI: 10.2749/222137815818358952
Abstrakt:

In the Netherlands a bridge is built crossing the motorway A27 near Utrecht. This bridge was constructed as a combination of steel and FRP, with a total length of 140 meters. The bridge is made of a steel truss girder and a deck of FRP (composite).The connection of the composite deck to the steel truss girder was a challenging part. To solve this problem two load-paths are introduced. The first is made with an adhesive compound, the second with a pin-hole connection. Also the location of the bridge with the foundation inside a polder construction with highly compressible soil was a challenge to solve. The use of a jet grouting was necessary to solve this problem.

Stichwörter:
Stahl Brücke Verbund CFK Düsenstrahlverfahren Hybrid

Bauwerke und Projekte