0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

The durability of Finger Type expansion joints for Penang Second Bridge with Comparison studies based on expansion joints for bridges in Malaysia & around the world

The durability of Finger Type expansion joints for Penang Second Bridge with Comparison studies based on expansion joints for bridges in Malaysia & around the world
Autor(en):
Beitrag für IABSE Conference: Engineering the Developing World, Kuala Lumpur, Malaysia, 25-27 April 2018, veröffentlicht in , S. 720-725
DOI: 10.2749/kualalumpur.2018.0720
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.07 MB

The cost of maintenance & replacement of movement joints in bridges around the world have been a major concern for all government authorities and highway operators. Damaged movement joints not only...
Weiterlesen

Bibliografische Angaben

Autor(en): (Managing Director – Hercules Group of Companies, Selangor, MALAYSIA)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Conference: Engineering the Developing World, Kuala Lumpur, Malaysia, 25-27 April 2018
Veröffentlicht in:
Seite(n): 720-725 Anzahl der Seiten (im PDF): 6
Seite(n): 720-725
Anzahl der Seiten (im PDF): 6
DOI: 10.2749/kualalumpur.2018.0720
Abstrakt:

The cost of maintenance & replacement of movement joints in bridges around the world have been a major concern for all government authorities and highway operators. Damaged movement joints not only impaired serviceability of roads & bridges, it also causes losses of income to the government authorizes / operators and most critically, legal suits by the public due to failure to provide public safety.

This paper is aimed to provide more technical information for further improvement in the quality & durability of movement joints. The various types of movement joints installed in bridges in Malaysia and around the world will be presented. The causes of failures will be analyzed together with replacement cost comparison. A case study using the example of Penang Second Bridge will also be presented.

Stichwörter:
Brücke Fahrbahnübergangskonstruktion (FÜK) Fugenversagen

Bauwerke und Projekte