0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Productivity increase in the design and construction of bridges

 Productivity increase in the design and construction of bridges
Autor(en): , , , ,
Beitrag für IABSE Symposium: Construction’s Role for a World in Emergency, Manchester, United Kingdom, 10-14 April 2024, veröffentlicht in , S. 1268-1276
DOI: 10.2749/manchester.2024.1268
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.2 MB

The construction industry is behind other industries in productivity. With more large infrastructure projects to be built, it is essential that design and construction could be performed with high ...
Weiterlesen

Bibliografische Angaben

Autor(en): (Chalmers University of Technology, Swedish Transport Administration, Sweden)
(Norwegian University of Science and Technology, Norway)
(Chalmers University of Technology, Sweden)
(Chalmers University of Technology, Sweden)
(Swedish Transport Administration, Sweden)
(Swedish Transport Administration, Sweden)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Symposium: Construction’s Role for a World in Emergency, Manchester, United Kingdom, 10-14 April 2024
Veröffentlicht in:
Seite(n): 1268-1276 Anzahl der Seiten (im PDF): 9
Seite(n): 1268-1276
Anzahl der Seiten (im PDF): 9
DOI: 10.2749/manchester.2024.1268
Abstrakt:

The construction industry is behind other industries in productivity. With more large infrastructure projects to be built, it is essential that design and construction could be performed with high productivity. This paper focuses on how standardisation of bridges can result in higher productivity. A quantitative study was performed to examine essential parameters that have potential to increase productivity in the Swedish bridge construction industry; it also examines how standardisation could increase productivity; and how specific incentives of the three significant actors (contractor, client and design engineer) could be obstacles to productivity. The main findings are that the actors believe in standardisation as a way to increase productivity. Reinforcement layout was one important parameter to increase productivity. Contractor’s view on profit could be an obstacle to productivity. Increased productivity would be more sustainable infrastructure delivery and here the client has an important role to play.