Strengthening of the A52 Clifton Stage 2 bridge in Nottingham

 Strengthening of the A52 Clifton Stage 2 bridge in Nottingham
Autor(en): , , ,
Beitrag für IABSE Symposium: Construction’s Role for a World in Emergency, Manchester, United Kingdom, 10-14 April 2024, veröffentlicht in , S. 988-996
DOI: 10.2749/manchester.2024.0988
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.1 MB

The A52 Clifton bridge is a 6-span post-tensioned concrete bridge, which carries the A52 trunk road in the City of Nottingham (UK). The bridge was built in the early 1970’s and comprises two distin...
Weiterlesen

Bibliografische Angaben

Autor(en): (Tony Gee and Partners LLP, Esher, Surrey, UK)
(Tony Gee and Partners LLP, Esher, Surrey, UK)
(VSL Systems (UK) Ltd, London, UK)
(National Highways, Annesley, Nottinghamshire, UK)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Symposium: Construction’s Role for a World in Emergency, Manchester, United Kingdom, 10-14 April 2024
Veröffentlicht in:
Seite(n): 988-996 Anzahl der Seiten (im PDF): 9
Seite(n): 988-996
Anzahl der Seiten (im PDF): 9
DOI: 10.2749/manchester.2024.0988
Abstrakt:

The A52 Clifton bridge is a 6-span post-tensioned concrete bridge, which carries the A52 trunk road in the City of Nottingham (UK). The bridge was built in the early 1970’s and comprises two distinct bridges: the South Approach Viaduct and the Main Bridge over the River Trent. In February 2020, severe corrosion was identified within the external strands inside the South Viaduct. Lane restrictions were implemented while further investigations confirmed additional corrosion in the prestressing strands for both superstructures. The assessments revealed shortfalls in strength and led to the design of a deck strengthening solution using additional prestressing tendons. This paper describes the strengthening solution for both superstructures including the construction sequences and discusses the destressing works of a selected number of external redundant strands within the Main Bridge allowing the new strengthening tendons to be fully jacked to their final specified forces.

Stichwörter:
Brücke Verstärkung Instandsetzung Bewertung